Hello everyone.
It’s been a while now that I have not written here, freezing cold has paralyzed France recently, this is the first time this has happened, the water has been frozen for two weeks in my studio. Could not work properly in these conditions, and even less take the risk of putting water in a boiler.
I got the last pieces that I missed to end the Velox, and finished the reassembly. I made a carrying timber to fix the machine while retaining some access to the rear for test there is no leak. I wait a bit to be sure that the temperature does not come down again, I will come back and tell you the first attempts to start.
Pascal